You are viewing an obsolete version of the DU website which is no longer supported by the Administrators. Visit The New DU.
Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Reply #56: The pipe that is used to send down the heavy clay was successfully inserted [View All]

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU
Swamp Rat Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-26-10 02:53 AM
Response to Reply #54
56. The pipe that is used to send down the heavy clay was successfully inserted
I have no information other than what I am watching on the govt spillcam, and my basic civil engineering training.

http://globalwarming.house.gov/spillcam

the pipe is connected into a receiving box, then flexible hoses will be attached to a choke, which is attached to the BOP. When thall these steps are finished, they will inject bentonite clay.
Printer Friendly | Permalink |  | Top
 

Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC