WAXMAN: New Back-up Docs-BP’s Well Failure Due to Effort to Save $10 Million

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU
 
kpete Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Jun-14-10 04:23 PM
Original message
WAXMAN: New Back-up Docs-BP’s Well Failure Due to Effort to Save $10 Million
BP’s Well Failure Due to Effort to Save $10 Million?
By: emptywheel Monday June 14, 2010 12:01 pm


Henry Waxman just put up a letter and a whole bunch of backup documents in preparation for a hearing with Tony Hayward Thursday. In it, he lists 5 shortcuts BP used in the days before the well explosion, all of them with real risks. But BP chose them to save money and time.

http://energycommerce.house.gov/index.php?option=com_content&view=article&id=2043:chairmen-send-letter-to-bp-ceo-prior-to-hearing&catid=122:media-advisories&Itemid=55
http://energycommerce.house.gov/documents/20100614/Hayward.BP.2010.6.14.pdf

Well Design. On April 19, one day before the blowout, BP installed the final section of steel tubing in the well. BP had a choice of two primary options: it could lower a fu ll string of “casing” from the top of the wellhead to the bottom of the well, or it could hang a ” liner” from the lower end of the casing already in the well and install a “tieback” on top of the liner. The liner-tieback option would have taken extra time and was more expensive, but it would have been safer because it provided more barriers to the flow of gas up the annul ar space surrounding these steel tubes. A BP plan review prepared in mid-April recommended against the full string of casing because it would create “an open annulus to the wellhead” and make the seal assembly at the wellhead the “only barrier” to gas flow if the cement job failed. Despite this and other warnings, BP chose the more risky casing option, apparently because the liner option would have cost $7 to $10 million more and taken longer.

Centralizers. When the final string of casing was installed, one key chall enge was making sure the casing ran down the center of the well bore. As the American Petroleum Institute’s recommended practices explain, if the casing is not centered, “it is difficult, if not impossible, to displace mud effectively from the narrow side of the annulus,” resulting in a failed cement job. Halliburton, the contractor hired by BP to cement the well, warned BP that the well could have a “SEVERE gas flow problem” if BP lowered the final string of casing with only six centralizers instead of the 21 recommended by Halliburton. BP rejected Halliburton’s advice to use additional centralizers. In an e-mail on April 16, a BP official involved in the decision explained: ” it will take 10 hours to install them . .. . I do not like this.” Later that day, another official recognized the risks of proceeding with insufficient centralizers but commented: “who cares, it’s done, end of story, will probably be fine.”

Cement Bond Log. BP’s mid-April plan review predicted cement failure, stating “Cement simulations indicate it is unlikely to be a successful cement job due to formation breakdown.” Despite this warning and Halliburton’s prediction of severe gas flow problems, BP did not run a 9- to 12-hour procedure called a cement bond log to assess the integrity of the cement sea l. BP had a crew from Schlumberger on the rig on the morning of April 20 for the purpose of running a cement bond log, but they departed after BP told them their services were not needed. An independent expert consulted by the Committee called this decision “horribly negligent.”

.................

Lockdown Sleeve. Because BP elected to use just a single string of casing, the Macondo well had just two barriers to gas flow up the annular space around the final string of casing: the cement at the bottom of the well and the seal at the wellhead on the sea floor. The decision to use insufficient centralizers created a significant risk that the cement job would channel and fail, while the decision not to run a cement bond log denied BP the opportunity to assess the status of the cement job. These decisions would appear to make it crucial to ensure the integrity of the seal assembly that was the remaining barrier against an influx of hydrocarbons. Yet, BP did not deploy the casing hanger lockdown sleeve that would have prevented the seal from being blown out from below.

more:
http://emptywheel.firedoglake.com/2010/06/14/bps-well-failure-due-to-effort-to-save-10-million/
Printer Friendly | Permalink |  | Top
SpiralHawk Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Jun-14-10 04:26 PM
Response to Original message
1. BP employing Republicon Family Pharisee Values = FAIL
Edited on Mon Jun-14-10 04:27 PM by SpiralHawk
As always.

Printer Friendly | Permalink |  | Top
 
pscot Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Jun-14-10 04:27 PM
Response to Original message
2. They were gonna put the money
in their environmental cleanup fund, I betcha.
Printer Friendly | Permalink |  | Top
 
Scurrilous Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Jun-14-10 04:28 PM
Response to Original message
3. Well, that worked out just fine.
:thumbsdown:
Printer Friendly | Permalink |  | Top
 
The Backlash Cometh Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Jun-14-10 04:57 PM
Response to Original message
4. How much will it cost them now?
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Sun May 05th 2024, 07:17 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC