Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

Yo_Mama_Been_Loggin

(107,956 posts)
Sat May 15, 2021, 02:49 PM May 2021

4.3-mile trail is 'transformational' for Tacoma's Eastside -- and it's finally complete

May 15—As far back as 20 years, it's been the dream of Tacomans to have access to a pedestrian and bicycle trail through the Eastside.

Just ask Tacoma City Council member Catherine Ushka, who lives in and represents residents in East Tacoma.

"The goal to have a multimodal access trail through here has been in vision since at least 2000, if not before," Ushka said in an interview with The News Tribune on Friday. "So the steps to get here have been many and hard-fought."

That fight is over.

The city completed the third and final phase of the Pipeline Trail within Tacoma city limits, which stretches 1.4 miles from 56th Street and Pipeline Road to the Tacoma-Pierce County line at East 72nd Street and Waller Road East.

The trail is ADA accessible with 12-foot wide asphalt surface, LED lighting, signage and benches. Cost of the project totaled $2.5 million

https://www.msn.com/en-us/news/us/4-3-mile-trail-is-transformational-for-tacoma-s-eastside-and-it-s-finally-complete/ar-BB1gLMRs

Latest Discussions»Region Forums»Washington»4.3-mile trail is 'transf...