(31,182 posts)Today, Beyond Nuclear, Citizens Environment Coalition of Southwestern Ontario, Don't Waste Michigan, and the Green Party of Ohio filed a 60 page contention against the proposed 2017 to 2037 license extension at Davis-Besse atomic reactor on Lake Erie near Toledo, due to recently revealed severe cracking of its concrete shield building/secondardy radiological containment structure. A copy of the contention is posted here.
http://www.beyondnuclear.org/storage/FINAL%20Contention%205%20Cracking%20January%2010%202012.pdf
The U.S. Nuclear Regulatory Commission allowed FirstEnergy Nuclear Operating Company to restart the reactor on December 6, 2011, even though the root cause and full extent of the cracking has not been determined, and corrective actions have not been identified.
Also today, the NRC's Atomic Safety and Licensing Board rejected a motion by FENOC (First Energy) calling for dismissal of the environmental coalition's primary contention against the Davis-Besse license extension -- that the nearly 910 Megawatts of electricity could be readily replaced by a combination of wind power, solar power, and energy storage. The ruling is posted here.
http://www.beyondnuclear.org/storage/ASLB%20Memorandum%20and%20Order%20Denying%20Motion%20to%20Dismiss%20Contention%201%20Jan%2010%202012.pdf
The environmental coalition's attorney, Terry Lodge of Toledo, and its expert witness, Al Compaan, Emeritus Professor of Physics at the University of Toledo, prepared a response to FENOC, defending the renewable energy alternatives contention; it is posted here.
http://www.beyondnuclear.org/storage/Memo%20oppstn%20MSD%20complete%20FINAL2%206pm%20Jan%209%202012.pdf
The environmental coalition issued a media release about today's filing of its shield building cracking safety challenges. The media release is posted here.
http://www.beyondnuclear.org/storage/crack%20contention%201%2010%202012%20press%20release.pdf

An NRC inspector examines one of the recently revealed cracks in the Davis-Besse concrete shield building
http://www.beyondnuclear.org/home/2012/1/10/environmental-coalition-challenges-davis-besse-license-exten.html