Welcome to DU!
The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards.
Join the community:
Create a free account
Support DU (and get rid of ads!):
Become a Star Member
Latest Breaking News
Editorials & Other Articles
General Discussion
The DU Lounge
All Forums
Issue Forums
Culture Forums
Alliance Forums
Region Forums
Support Forums
Help & Search
Environment & Energy
In reply to the discussion: "The battle of the energy titans comes down to one great contest: nuclear vs. coal." [View all]OKIsItJustMe
(21,875 posts)43. Jimmy had an excellent heart and was … not an engineer.
http://www.history.navy.mil/faqs/faq60-14.htm
Detached from Pomfret on 1 February 1951, Carter was assigned as Engineering Officer for the precommissioning detail for USS K-1 (SSK 1). K-1, the first postwar submarine built, was under construction by Electric Boat Division, General Dynamics Corporation, Groton, Connecticut. After K-1's commissioning on 10 November 1951, Carter served as Executive Officer, Engineering Officer, and Electronics Repair Officer. During this tour he also qualified for command of a submarine.
From 1 March to 8 October, Carter was preparing to become the engineering officer for the nuclear power plant to be placed in USS Seawolf (SSN 575), one of the first submarines to operate on atomic power. He assisted in setting up training for the enlisted men who would serve on Seawolf. During this time his father became very sick and died in July 1953. After his father's death in 1953, Carter resigned from the Navy to return to Georgia to manage the family interests. Carter was honorably discharged on 9 October 1953 at Headquarters, Third Naval District in New York City. On 7 December 1961, he transferred to the retired reserve with the rank of Lieutenant at his own request.
http://ottawariverkeeper.ca/news/when_jimmy_carter_faced_radioactivity_head_on/
It was a very exciting time for me when the Chalk River plant melted down, Jimmy Carter, now 83, said in a recent interview in his hometown of Plains, Georgia.
I was one of the few people in the world who had clearance to go into a nuclear power plant.
On Dec. 12, 1952, the NRX reactor at Atomic Energy of Canadas Chalk River Laboratories suffered a partial meltdown. There was an explosion and millions of litres of radioactive water ended up in the reactor buildings basement. The crucial reactors core was no longer usable.
I was in charge of building the second atomic submarine and that is why I went up there, said Mr. Carter. There were 23 of us and I was in charge. I took my crew up there on the train.
Detached from Pomfret on 1 February 1951, Carter was assigned as Engineering Officer for the precommissioning detail for USS K-1 (SSK 1). K-1, the first postwar submarine built, was under construction by Electric Boat Division, General Dynamics Corporation, Groton, Connecticut. After K-1's commissioning on 10 November 1951, Carter served as Executive Officer, Engineering Officer, and Electronics Repair Officer. During this tour he also qualified for command of a submarine.
From 1 March to 8 October, Carter was preparing to become the engineering officer for the nuclear power plant to be placed in USS Seawolf (SSN 575), one of the first submarines to operate on atomic power. He assisted in setting up training for the enlisted men who would serve on Seawolf. During this time his father became very sick and died in July 1953. After his father's death in 1953, Carter resigned from the Navy to return to Georgia to manage the family interests. Carter was honorably discharged on 9 October 1953 at Headquarters, Third Naval District in New York City. On 7 December 1961, he transferred to the retired reserve with the rank of Lieutenant at his own request.
http://ottawariverkeeper.ca/news/when_jimmy_carter_faced_radioactivity_head_on/
It was a very exciting time for me when the Chalk River plant melted down, Jimmy Carter, now 83, said in a recent interview in his hometown of Plains, Georgia.
I was one of the few people in the world who had clearance to go into a nuclear power plant.
On Dec. 12, 1952, the NRX reactor at Atomic Energy of Canadas Chalk River Laboratories suffered a partial meltdown. There was an explosion and millions of litres of radioactive water ended up in the reactor buildings basement. The crucial reactors core was no longer usable.
I was in charge of building the second atomic submarine and that is why I went up there, said Mr. Carter. There were 23 of us and I was in charge. I took my crew up there on the train.
Edit history
Please sign in to view edit histories.
Recommendations
0 members have recommended this reply (displayed in chronological order):
90 replies
= new reply since forum marked as read
Highlight:
NoneDon't highlight anything
5 newestHighlight 5 most recent replies
RecommendedHighlight replies with 5 or more recommendations
"The battle of the energy titans comes down to one great contest: nuclear vs. coal." [View all]
wtmusic
Dec 2011
OP
Where is the scientific analysis that concludes "renewables are...not enough on their own"?
kristopher
Dec 2011
#4
I didn't provide a scientific analysis of the deficiencies inherent in billions of hamster wheels
wtmusic
Dec 2011
#19
Only shills for the nuclear industry say that energy choice is limited to either coal or nukes.
diane in sf
Dec 2011
#6
98.7% of the energy now used by is destroying the future of 100% of life on this planet.
GliderGuider
Dec 2011
#11
I believe the DoE figure (100 miles × 100 miles) relates to electical needs only
OKIsItJustMe
Dec 2011
#78
Here are articles with a non-mainstream view of various aspects of the global eco-clusterfuck.
GliderGuider
Dec 2011
#26
..reduce energy consumption, material consumption, our numbers and overall activity levels by 85%..
Ghost Dog
Dec 2011
#33
The thing is, oil will become unaffordable a decade or two before the aquifers are depleted.
joshcryer
Dec 2011
#84
Speaking strictly of TVs, your choice of tv can mean up to 70% energy savings (Chart)
txlibdem
Dec 2011
#28